Power Pole Installation
A Lieherr 1095 120 ton crane with a custom built davit arm was used to lift live power cables for the installation of new poles in multiple locations over one week.
Building Alberta's power infrastructure is building our future and doing it safely is what we are all about.
A Lieherr 1095 120 ton crane with a custom built davit arm was used to lift live power cables for the installation of new poles in multiple locations over one week.