We are currently hiring for a variety of positions within our organization. We would love to receive your applications through our Careers System.
We are currently hiring for a variety of positions within our organization. We would love to receive your applications through our Careers System.
Case Studies
Coil Swap Using 100 Ton Link-Belt
| Dec 30 / 13
Coil Swag Using 100 Ton Link-Belt for Step Energy
Stampede Crane & Rigging recently performed a coil swap using a 100 ton Link-Belt Crane. The coil weighed in at 83,000 lbs and was safely hoisted and swapped out in a day.
Great work by our crew and a big thanks for the partnership with Step Energy to safely and efficiently swap out the massive coil.
Equipment Used: 100 Ton Link-Belt
Project Description: Coil Removal & Coil Install into Rig
Project Details: Coil weight 83,000 lbs
Coil Swag Using 100 Ton Link-Belt for Step Energy
Stampede Crane & Rigging recently performed a coil swap using a 100 ton Link-Belt Crane. The coil weighed in at 83,000 lbs and was safely hoisted and swapped out in a day.
Great work by our crew and a big thanks for the partnership with Step Energy to safely and efficiently swap out the massive coil.
Equipment Used: 100 Ton Link-Belt
Project Description: Coil Removal & Coil Install into Rig
Project Details: Coil weight 83,000 lbs